The Airedale Line is the name given to one of the rail services in the West Yorkshire Metro area of northern England. The service is operated by Northern Rail, on the route connecting Leeds with Morecambe and Carlisle in the North of England. The route covered by the service was part of the Midland Railway (Midland) system. The line is electrified at 25 kV AC Overhead between Leeds and Skipton.
The Route & its historyLeeds - SkiptonThe first section, between Leeds and Bradford (Forster Square station) was opened by the Leeds and Bradford Railway on 1 July 1846. The route is described below: it originally included stations serving the following places, many of which are now closed:
Skipton - SettleThe line from here, known as the "Little" North Western Railway, opened on 1 June 1850 to Lancaster. Here were junctions for the following lines:
The main line continues:
Settle Junction - LancasterThe original main line to Lancaster had the following stations:
Settle Junction - CarlisleThe line to Carlisle, from Settle Junction, opened by the Settle-Carlisle Railway (and still known by the name), served the following places:
The Settle-Carlisle Railway is featured in Microsoft Train Simulator (MSTS1). In it you can drive a train lead by the Flying Scotsman steam engine or a British Rail Class 50 in various scenarios. Using add-ons you can also use modernised DMUs or even a Virgin Pendolino, albeit hauled by a Class 57 Thunderbird loco. The line todayThe Line is operated by the Northern Rail operating company. The fare structure is as follows (these show the Metrocard zones:
Beyond this point the Metro fares do not operate. The FutureRecent Network Rail reports have looked at ways of increasing capacity on the line. Because of the difficulty of lengthening platforms at Shipley, it will be hard to introduce longer trains (i.e. 5 or 6 carriages) as is being proposed on the neighbouring Wharfedale Line. It is therefore proposed to run more trains per hour between Leeds and Keighley, with a new platform at Keighley to accommodate this[1]. New stations at Kirkstall Forge and Apperly Bridge between Leeds and Shipley are proposed by Metro. National Express East Coast (NXEC) currently operate a small number of daily services on the line, between Skipton/Bradford and Leeds before heading to London King's Cross. These are mostly diesel services, because the overhead electric cables on the line between Shipley and Skipton cannot support both local trains and high-speed electric services (due to the extra power needed by the locomotives). NXEC wants to run more frequent services from December 2009 but to do so would require the use of electric locomotives, which cannot happen unless the electric supply is upgraded.[2] A recent report by Modern Railways claimed that a solid hourly service would operate on the Airedale Line as far as Long Preston, but would serve Carlisle and Lancaster alternately. It may also become a freight artery to improve capacity on the West Coast Main Line. Network Rail's own latest plans involve new signalling and other improvements for the sections of the line beyond Skipton. Carlisle services will be increased to a basic two hour pattern with extra services to 'fill in the gaps' at peak times during the day to give a 1 train/h frequency[3]. Lancaster services will also be made more frequent, however it has been suggested they will be terminated at Skipton in future, rather than continuing through to Leeds as at present[4]. All of these plans are still dependent on getting enough government funding. ReferencesExternal links
| | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||